Jump to content

Laser Highways: Difference between revisions

From In-System
No edit summary
No edit summary
Line 1: Line 1:
= The Laser Highway =
The Laser Highway actually will consist of multiple hiways connected at transfer points. The first leg, which connects L1 to Luna, is already built:  
The Laser Highway actually will consist of multiple hiways connected at transfer points. The first leg, which connects L1 to Luna, is already built:  


Formal Name: Luna-L1 Directed Energy Corridor
=== Luna-L1 Directed Energy Corridor ===


Corporate Name: Laser Highway Segment One
Corporate Name: Laser Highway Segment One


Common Name: The L1L
Common Name: The L1L
The L1L is already treated almost like a railroad, not a laser. The important thing is the traffic. By 2158 you might hear:
"L1L traffic is down 8% this quarter."
"The Tycho strike delayed L1L maintenance."
"Atlas closed the L1L for six hours."
"A ship missed its L1L insertion window."
The beam becomes invisible and mundane; the corridor becomes important.

Revision as of 01:34, 9 June 2026

The Laser Highway

The Laser Highway actually will consist of multiple hiways connected at transfer points. The first leg, which connects L1 to Luna, is already built:

=== Luna-L1 Directed Energy Corridor ===

Corporate Name: Laser Highway Segment One

Common Name: The L1L

The L1L is already treated almost like a railroad, not a laser. The important thing is the traffic. By 2158 you might hear:

"L1L traffic is down 8% this quarter."

"The Tycho strike delayed L1L maintenance."

"Atlas closed the L1L for six hours."

"A ship missed its L1L insertion window."

The beam becomes invisible and mundane; the corridor becomes important.